Kaminoyama-Onsen interchange Aerial Photograph, Site Map and Site Information

map

The outline of Industrial Park
Location Kaminoyama City
Developer Kaminoyama City
Total Area 6.2ha
Possible sale area 6.2ha
Selling price (yen/m2) about 14,300
Highway Tohoku Central Expressway

 Kaminoyama-Onsen I.C.(0.5km, 1min.)

National road Route13(0.5km, 1min.)
Airport Yamagata Airport(39km, 36min.)
Port Sandai Port(92km, 90min)
Sakata North Port(142km, 120min)
Railroad Kaminoyama-Onsen Station(4km, 9min.)
The present condition in preparation(around March 2021 sale start)
Area Outside of city planning area
Water Water supply/260m3/day
Drainage To be processed by the corporate and then drained to the public drain
Electricity 5.7㎞ from Kaminoyama Transformer Substation
Lease plan To be negotiated
The outline of Location
Region Murayama Region
Population about 541,000
School Yamagata University (Faculty of Literature and Social Science, Faculty of Education, Faculty of Science, Faculty of Medicine)
Tohoku University of Art & Design
Yamagata College of Industry and Technology
25 High schools
URL Kaminoyama City